Our Stories

People and careers

From Start to Finish – Meet Chris Berringer

Shipbuilding is a team effort, requiring collaboration and dedication from all areas of industry and the business. Few know that better than Chris Berringer. A staple within the Arctic and Offshore Patrol Ship (AOPS) program, Chris joined the program at its inception as a Production Planner and is now helping oversee its completion as Program Manager. 

Chris Berringer – Program Manager, AOPS

An Aerospace Manufacturing Engineering Technologist by trade, Chris spent 11 years working in the aerospace industry after attending Confederation College in his hometown of Thunder Bay, Ontario, before moving to Calgary to work as a steelmaker. Chris’ experience in Calgary gave him extensive knowledge of steel, which made joining Canada’s National Shipbuilder a natural next step. Moving across the country may be daunting to some, but Chris saw the move as a logical progression in his career and life.

“A large part of my decision was Halifax itself. I've always been drawn to the Atlantic Ocean,” says Chris. “Beyond the location, job security was a significant factor. With the National Shipbuilding Strategy and the long-term contracts associated with the AOPS program, there was clear stability and opportunity. The opportunity to contribute to building vessels for Canada, combined with long-term career prospects, made shipbuilding very appealing.”

Upon arriving at Irving Shipbuilding, Chris began work on the first Arctic and Offshore Patrol Ship, HMCS Harry DeWolf. The first new warship for Canada in nearly twenty-five years, the vessel naturally brought new challenges, but Chris and the team remained steadfast in their goal.

“When we started the AOPS program, everything was new. New ships, new teams, new processes, and significant facility upgrades,” says Chris. “Delivering the first ship required enormous effort from everyone across the business. It truly takes an army to work through the challenges and lessons learned of a first-in-class vessel. Being able to contribute to that was so satisfying when the vessel was delivered to the Royal Canadian Navy. I'll never forget looking at AOPS 1 during a challenging stretch when a gentleman from Bath Iron Works tapped me on the shoulder and said, ‘You know, Chris? One day it will sail away. Just have faith.’”

HMCS Harry DeWolf delivery – July 2020

“That really changed my perspective. Building first-of-class vessels is difficult. There are a lot of challenges, setbacks, and lessons learned along the way. It takes hard work, dedication, perseverance, and teamwork to overcome those obstacles. When you see a photo of the vessel operating up North, fully crewed and carrying out its mission, it's very rewarding. When HMCS Harry DeWolf transited through the Northwest Passage, we were able to share our shipbuilding story with the communities throughout Northern Canada, which was a remarkable feeling.”

HMCS Harry DeWolf Ice Trials – February 2021

Since helping deliver HMCS Harry DeWolf, Chris has worked on each ship in the Harry DeWolf-class for the Royal Canadian Navy and is now working on delivering the AOPS variant to the Canadian Coast Guard. As Chris has grown with the program, his advice for new shipbuilders is to stay resilient and dedicated. 

“Work hard. Show up. You're going to make mistakes, and that's okay. Everyone makes mistakes. Hard work and dedication are what get ships built. What's important is putting in the effort, learning from those experiences, and continuously improving.”

In Chris’ decade-plus career in shipbuilding, something that continues to impress him is the cross-functional collaboration and dedication to achieving goals and delivering on the objectives of the National Shipbuilding Strategy. 

“Our production team consistently opens my eyes to what shipbuilding really is,” says Chris. “People often don’t see the time and effort our production team puts in to ensure these ships get built. When a ship is launched, people don’t see the work put in the night before to ensure the vessel is ready morning of, they see the ship floating off in the Bedford Basin and assume that things went smoothly because they’re supposed to, but the work our production team puts in to make that milestone a success and look easy is so important. I’ve seen perseverance, energy, execution, and commitment time after time from our production team, and it’s incredible.”

Chris and a Fagioli team member prior to the bow mega block roll out for HMCS Frédérick Rolette

As the AOPS program nears completion, Chris remains most proud of the people behind the ships. From AOPS 1 to AOPS 8, Chris is one of many showcase the dedication, resilience, and teamwork required to build quality ships for Canada.

“The ships are remarkable, but it’s the people who make them possible,” says Chris. “Every milestone reflects the hard work and commitment of thousands of individuals. I'm so proud to be a part of the National Shipbuilding Strategy. It's incredibly significant for Canada, for our economy, and for the people who rely on these vessels to protect and serve our country.”

From first steel cut to delivery, Chris Berringer is proudly building ships for Canada.

Published:

Follow us on social media.